The venue's generator fuel allowance ends before our reception does

Weddings category photographWeddings

Our rural venue runs the reception tent from a generator. The final power sheet includes four hours of fuel, while our lighting, catering and music need power for nearly seven.

The venue says the standard allowance begins when guests enter, not when vendors start setup. The generator company says refrigeration and lighting checks require it to run at least ninety minutes earlier.

Additional fuel and an attendant are available for a fee we did not budget. Turning the generator off during setup is not realistic once food is chilled and the tent becomes dark near sunset.

I am less concerned about the surprise cost than about two vendors believing someone else controls the runtime. A power plan cannot depend on saving fuel minute by minute during the reception.

Who should own the operating schedule, and what documentation would you require before paying the extension?

Discussion

5 community replies

Require one written load and runtime plan signed off by the venue, generator company, caterer and production lead. Pay for continuous coverage from first critical setup through final shutdown.

Challenge the venue's allowance if its marketed reception package cannot operate for the contracted event length. Extra setup power may be yours, but guest-time power should not expire early.

Ask what happens under higher-than-estimated load and where backup power serves critical refrigeration. Runtime assumptions should include contingency, not only normal draw.

Does the quoted extension include reserve fuel and an on-site operator, or only estimated consumption? A full tank without someone able to respond is not the same protection.

Which basic venue utility turned out to have a meter running behind the celebration?