How should our group decide who keeps the model after the project is marked?
Education“I'll take it home,” my teammate said. The rest of us were still looking at the model we had spent three weeks building.
There are four of us. One person bought most of the cardboard; another built the moving section. I did much of the assembly. We never discussed what would happen afterwards. The base was borrowed from the department, so we also need to check what must be returned.
One teammate wants the model at home, and another wants to offer it for a classroom display. I would like a record of our work, but I don't need the whole thing.
How do we decide fairly without turning material costs or hours worked into a rule we never agreed? I don't want the first person with room in their car to make the choice for everyone.